Belle Terrace Storm Drain Pump Station
Bakersfield, California: Pump Station
Project Details
Installation of (2) 6,600 GPM – 85HP submersible pumps and associated piping inside a 50’ deep wet well structure with a 90” RCP drainage line from the 99 Freeway. Caliagua installed all piping including pipe supports, discharge vault, structural steel, ladders, and misc. site concrete work.
- Owner – City of Bakersfield
- Engineer – Caliagua Inc
- Scope – Installation of (2) 6,600 GPM – 85HP Submersible Pumps
- Contract Value – $1.7 million
- Additional Scope – Pump Station Electrical and Utility Work