Belle Terrace Storm Drain Pump Station

Bakersfield, California: Pump Station

Project Details

Installation of (2) 6,600 GPM – 85HP submersible pumps and associated piping inside a 50’ deep wet well structure with a 90” RCP drainage line from the 99 Freeway. Caliagua installed all piping including pipe supports, discharge vault, structural steel, ladders, and misc. site concrete work.