Irvine Booster station
Irvine Water District: Potable Water
Project Details
Booster Station Modifications for Irvine Ranch Water District – Turtle Rock, Zone B
Caliagua manged the implemented the modifications to the existing Turtle rock booster station. This work included modifications to
- Pump and motor,
- Piping and valve (Cla-Val’S)
- New variable frequency drives and motor control center
Tagged Pump Station