Tustin Zone 5 Station
Irvine Ranch Water District: Potable Water Pump Station
Project Details
Caliagua installed a potable booster pump station in Tustin, CA for the Irvine Ranch Water District.
This turnkey project included installation of a potable water booster pump station, including:
- (3) 200HP vertical. turbine pumps and motors
- 20” thru 8” CML/C Stl Piping
- (2) Surge Tanks
- Control Valves
- 7 Bypass System
- Construction of a masonry building including: structural concrete, Stl roof framing & builtup roofing, painting, miscellaneous metal work, installation of an HVAC system
- Installation of the pump station included mechanical piping, electrical, instrumentation, and telemetry work
Tagged Potable Water